5GMEDE
  • Project
    • About the project
    • Objectives
    • Approach
    • Deliverables
    • Publications
    • Brochure
  • Partners
    • Consortium overview
    • Argela
    • Allbesmart
    • Celfinet
    • Instituto Politécnico de Castelo Branco
    • JCP-Connect
    • Saguna
    • University of Aveiro
  • News
  • Contact
Select Page
Deliverables
  • D1.1 Risk Analysis Report (M1)
  • D2.1: Scenario and Use Case Definitions: Report on scenarios and use case definitions to be used and demonstrated in the project (M6)
  • D2.2: System Requirements Specification: Scenario specific system requirements specifications (M9)
  • D2.3: System Design and Architecture: Initial system design and architecture definition (M12)
  • D2.4: System Design and Architecture: Final system design and architecture definition (M18)
  • D3.1 Initial MEC System Level Design (M9)
  • D3.2 Final MEC System Level Design (M15)
  • D3.3 MEC System Level Implementation *Software* (M21)
  • D4.1 Initial MEC Host Level Design (M9)
  • D4.2 Final MEC Host Level Design (M15)
  • D4.3 MEC Host Level Implementation *Software* (M21)
  • D5.1 Initial Base Station MEC Services Design (M9)
  • D5.2 Final Base Station MEC Services Design (M15)
  • D5.3 Base Station MEC Services Implementation *Software* (M21)
  • D6.1 Initial MEC Caching System and Demonstration Scenarios Definition (M9)
  • D6.2 Final MEC Caching System and Demonstration Scenarios Definition (M15)
  • D6.3 Final Report on Implementation *Software* (M21)
  • D7.1 Initial integration, validation and demonstration plan (M12)
  • D7.2 Final integration and validation results (M21)
  • D7.3 Final demonstration results (M24)
  • D8.3 Dissemination, Standardization and Exploitation Activities Report for the period M01-M12 (M12)
  • D8.4 Dissemination, Standardization and Exploitation Activities Report for the period M13-M24 (M24)
Design by JCP-Connect for 5GMEDE